The Pick News

BMG spins the diamond bit at Abercromby Gold Project - The Pick Online Magazine

Written by Staff Writer | Nov 2, 2021 9:12:03 AM

BMG Resources Limited (ASX: BMG) has commenced the 2,000m diamond drilling (DD) component of the current 6,000m RC/ DD programme at the company’s 100% owned Abercromby Gold Project in the Wiluna greenstone belt of Western Australia.

The drilling programme aims are to test the high-grade zones at Capital and test deeper extensions of the high-grade orebody.

The DD component will complete five RC holes (including one hole from the 2020 drill programme) that were terminated early due to water ingress, with the remaining holes testing the down dip and deeper continuity of the known mineralisation up to 500m below surface.

Areas to be tested at depth include the zones of thick, high-grade mineralisation already identified at deeper levels by the following significant intersections:

  • 26m @ 6.07 g/t Au from 192m including 7m @ 21.22 g/t Au from 192m (20ABRC0004)
  • 37m @ 1.70 g/t Au from 127m including 3m @ 15.29 g/t Au from 157m (20ABRC0008)
  • 37m @ 2.58g/t Au from 144m including 8m @ 8.1g/t Au from 173m (20ABRC0010)
  • 36m @ 1.30g/t from 232m including 8m @ 2.94g/t from 252m (21ABRC004)

The DD is expected to be completed in late November/ early December, with the first assays available in early December.

For further information please visit: http://www.bmgl.com.au/